KPMG – CANARY WHARF
PROJECT DETAILS
Client

KPMG

Contractor

CyclePods

Problem Addressed

200 cycle parking spaces required in restricted basement location in Canary Wharf

Timescale

Due to the demand for more parking this project was completed within 2 months from inception to completion.
Does your building require a fresh look or utilisation of space?, if so please contact our sales team on 0845 094 0490 or send us an email at info@cyclepods.co.uk

Swanke Hayden Connell Architects approached us to assist them in planning 200 bike parking spaces into a basement area within the new KPMG Head office at Canary Wharf, London. The current area had accommodate 200 bikes spaces but also full change facilities, a drying room, lockers, showers and toilets. Further to this the client wanted to achieve BREEAM out-standing! The original CAD drawing by Swanke Hayden Connell only contained 120 cycle parking spaces using traditional bike stands. This original layout would not have earned the project the necessary credits to achieve the required BREEAM rating.
Once we received the plans from Swanke Hayden Connell Architects, we began planning the area with Spacepods. We choose Spacepods as they can save up to 50% of the space required by traditional bike stands and are a cyclist friendly, easy to use, semi-vertical system. The final plan we generated for Swanke Hayden Connell Architects contained the 200 bikes spaces they required and in less space then the original layout using traditional bike stands. Due to this the rest of the basement area could be planned containing all the requirements for the project to achieve a BREEAM outstanding rating!